精品久久亚洲中文无码,欧美大屁股喷潮水XXXX,国产精品香蕉成人网在线观看,亚洲AV无码AV在线影院

Gabon PO project
時間:2018-11-13 source:本站



The project commences on March 20, 2014, with a contract period of 54 months, and the contracted contract amount is approximately $132 million. The project has a total length of 52KM, two-way two-lane, subgrade width of 12 meters, and design speed of 80km/h, including road 47.241. KM, one special bridge (Ogowe River Bridge), 4707m long, the main bridge of Beibei is 65+120+65=250m continuous rigid frame, the main bridge of Nanxun adopts 35+60+35=130m continuous box girder, the rest The approach bridge adopts a continuous continuous T-beam with a 30m prestressed slab and a simple continuous structure, and a bridge of 52m.


津ICP備 12005657號-1

QR Code

Contact

Address:Airport Construction Engineering Co.,Ltd

Tel:022-66708712

Fax:022-66708713

022-66708712

yhsgs@cccc-yhs.com

龙游县| 清水河县| 长子县| 南丰县| 福建省| 黄山市| 太保市| 井冈山市| 娄底市| 东丰县|