Lanzhou-Xinjiang Railway
時(shí)間:2018-11-16 source:本站
Commencement time:2010-5-11
Completion time:2014-9-30
Introduction:the total length of the main line
is 12.3km, and the total length of the bridge is 8930.82m, including 4 grand
bridges, 7 large bridges and 1 medium bridge; 10 subgrades with total length of
1951.5m; 2 tunnels with total length of 1500m. CRTSI ballastless track is
adopted for the track system of the whole line.