Beijing-Shanghai High-Speed Railway THTJ-6 Project
時(shí)間:2018-11-16 source:本站

.


Commencement time:2008-2-18

Completion time:2009-3-30

Introduction: the engineering task assumed by our company is mainly the offline engineering: total length of 11.845Km; mainly including: a station and a bridge. "A station" is Wuxi East Elevated Station with total length of 3.43Km; "a bridge" is Wuxi East Grand Bridge Section of Danyang-Kunshan grand bridge with total length of 8.415Km. The offline engineering mainly includes the bored pile, bearing platform and pier body.