精品久久亚洲中文无码,欧美大屁股喷潮水XXXX,国产精品香蕉成人网在线观看,亚洲AV无码AV在线影院

Haibin Expressway North Section Phase II Project (untwining harbor Line 3 to Chengtougu)
時間:2018-11-14 source:本站


Commencement time:2008-9-20

Completion time:2010-9-20

Introduction:The total length of the route in the section is 9.12km. The bridge is 8.6km long, and the road is 0.52km. Most of the project is in the coastal beach beyond the current sea block. Yongding New River grand bridge has the variable cross section continuous box girder with the span length of 90m+160m+90m; the bridge within the range of Yongding New River regulation line adopts 50m simply supported T beam structure; the standard section of the main bridge adopts 35m simply supported-to-continuous small box beam structure; the prestress cast-in-place continuous box girder structure is adopted for the special-shape section of the main bridge.

 

 



津ICP備 12005657號-1

工會抖音公眾號

微信公眾號

聯(lián)系方式

地址:Airport Construction Engineering Co.,Ltd

電話:022-66708712

傳真:022-66708713

022-66708712

yhsgs@cccc-yhs.com

灌阳县| 濮阳县| 华容县| 富顺县| 高密市| 虹口区| 北宁市| 古交市| 连州市| 乌审旗|