Commencement time:2007-1-1
Completion time:2008-1-8
Introduction:The total length of the line is 8.300km, and there are 1 large bridge, 2 overpass bridges, 8 medium bridges, 7 small bridges and 1 stayed-cable bridge in total.
聯(lián)系方式
地址:Airport Construction Engineering Co.,Ltd
電話:022-66708712
傳真:022-66708713