Land Foundation Reinforcement Project in East of Nanjiang Port Area of Tianjin Port
時間:2018-11-15 source:本站


Commencement time:2004-10-16

Completion time:2005-8-10

Introduction:Land Foundation Reinforcement Project in East of Nanjiang Port Area of Tianjin Port. The total area is 312403m2, and it is divided into 13 areas. The average elevation of the current mud surface of the site is +4.5m, and the completion elevation shall be +5.7m. Area 13 is the replacement area with area of 2464m2; 9, 10, 11 and 12 are vacuum preloading areas with area of 92,317m2; area 1-8 are vacuum combined surcharge preloading areas with area of 217,622m2.