精品久久亚洲中文无码,欧美大屁股喷潮水XXXX,国产精品香蕉成人网在线观看,亚洲AV无码AV在线影院

Cofferdam Foundation Reinforcement Project in North of Nanjiang Port Area of Tianjin Port
時間:2018-11-15 source:本站



Commencement time:2004-6-10

Completion time:2005-3-10

Introduction:The total area of soft foundation reinforcement of the project is 256,680m2, including 13 areas. The average elevation of the current mud surface of the site is +4.5m, and the completion elevation shall be +5.7m. Area 1 is the replacement area with area of 1920m2; area 2, 3, 4 and 6 are vacuum preloading areas with area of 75,240m2; area 8-15 are the vacuum combined surcharge preloading areas with area of 179,520m2.  

 



津ICP備 12005657號-1

工會抖音公眾號

微信公眾號

聯(lián)系方式

地址:Airport Construction Engineering Co.,Ltd

電話:022-66708712

傳真:022-66708713

022-66708712

yhsgs@cccc-yhs.com

香港| 永州市| 读书| 光山县| 明光市| 静安区| 泾源县| 涟源市| 延津县| 靖边县|