Diaphragm Wall Project of Circulating Water Pump House of Hebei Guohua Huanghua Power Plant
時間:2018-11-15 source:本站


Commencement time:2004-6-1

Completion time:2005-10-11

Introduction:The depth of the foundation pit is about 16-17m during construction of the underground part of the pump house, and it belongs to construction of deep foundation pit. In order to guarantee smooth construction of the underground part of the pump house, the external side wall of the pump house is arranged as the underground diaphragm wall structure. The top elevation of the underground diaphragm wall structure is 2.0m, the bottom elevation is about -24.6m, and the thickness is 1.0m. The diaphragm wall is the support structure of the foundation pit during construction of the pump house, and is a part of the underground part structure of the pump house.



津ICP備 12005657號-1

工會抖音公眾號

微信公眾號

聯(lián)系方式

地址:Airport Construction Engineering Co.,Ltd

電話:022-66708712

傳真:022-66708713

022-66708712

yhsgs@cccc-yhs.com

芦溪县| 五原县| 安吉县| 探索| 江门市| 凌海市| 定州市| 元朗区| 永修县| 东源县|