精品久久亚洲中文无码,欧美大屁股喷潮水XXXX,国产精品香蕉成人网在线观看,亚洲AV无码AV在线影院

Beijing-Tianjin Expressway East Section Lot 5
時間:2018-11-14 source:本站


Commencement time:2004-3-16

Completion time:2005-11-30

Introduction:The total length of the line in the project is 2.806Km, and there are many farmland and fish ponds; there are the jet grouting pile, cement mixing pile, backfill gravel and other foundation treatment construction measures for the subgrade; the span of the north ring railway grand bridge is 1.7km. The upper beam structure is: the continuous box girder of cast-in-place pre-stressed concrete has 28 spans in total, and the largest span is 44m; there are 360 pieces of simply supported-continuous precast concrete small box beams, and the span is 25m. 4×25 and 5×25 span layout is adopted for the whole bridge.


津ICP備 12005657號-1

工會抖音公眾號

微信公眾號

聯(lián)系方式

地址:Airport Construction Engineering Co.,Ltd

電話:022-66708712

傳真:022-66708713

022-66708712

yhsgs@cccc-yhs.com

上虞市| 巴林左旗| 凤阳县| 思南县| 阜南县| 武汉市| 汕尾市| 商洛市| 射阳县| 福州市|