Commencement time:1983-6-20
Completion time:1985-7-20
Introduction:The project is 136.35m wide from south to north and 790.64m long from east to west. The building area is 108,000m2, and the whole construction area is mainly divided into two parts of storage yard and road. The storage yard is divided into three parts of the east, middle and west, and three parts are separated with 25m wide south-north road respectively. There is 6.4m wide traffic lane with box layout. The whole construction project is based on the reinforced concrete structure.